2 Cavity Thin Wall Container Bottom Mould

Model NO.: REMO-FC
Runner: Cold Runner
Design Software: UG
Installation: Fixed
Standard: HASCO
Customized: Customized
Name: 2 Cavity Thin Wall Container Bottom Mould
Cavity&Core Material: H13 / 2738 / P20
Mould Base Material: SAE1045 Steel
Mould Life: 1,000,000 Shots
Cooling System: Water Cooling
Sample Time: 45-60 Days
Sprue Gate: Side Gate
3D Format: X_T / Igs / STP / Sldprt/ Step / Stl / Dwg / etc.
Service: Logistic
Courier Service: Sample Via TNT /. DHL
Trademark: REMO
Specification: International Standard
Origin: Taizhou China
HS Code: 8480719090

2 Cavity Thin Wall Container Bottom Mould



2 cavity thin wall container bottom mould

As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.

Following information is essential for your better understanding on our moulds
Name Description
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc
Mould Base LKM, HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 days
Design Software UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step 
1. R& D We support customer R& D. Make the files or improve the design if you needed 
↓ ↓ ↓
2. Quotation Making Mould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation  The quality, price, material, delivery time. payment item. ect 
↓ ↓ ↓
4. Mould Design  3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. Mould According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days 
↓ ↓ ↓
6. Mould Testing When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot  If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory 
  ↓ ↓ ↓  
8. Delivery  Delivery goods by sea or by air, according  customers requirement 
Â